SHOPING MALL FLORYA - İSTANBUL

İSTANBUL- 124.000 m2-2011

 

•Heating and Cooling Installation

•Ventilation Installation

•Water Treatment Installation

•Clean Water-Waste Water-Rain Water Installation

•Fire Installation

•Natural Gas Installation

•Cooling Towers – Boiler Water Condenser Line Installation

•Siphonical system Rain Installation

•Central HVAC Automation