KEMAL HASOĞLU PRIMARY SCHOOL AND HIGH SCHOOL / İSTANBUL

İSTANBUL – 17.000 m2-2010

•Heating and Cooling Installation

•Ventilation Installation

•Clean Water-Waste Water-Rain Water Installation

•Fire Installation

•Water Treatment Installation

•Central Air Conditioning System (VRV)

•Heat Recovery Devices

•Central HVAC Automation